Germany
- Nuremberg
Inside Wall of Congress Hall

|
The huge core of red
brick that remains today shows the
general construction strategy of the Congress Hall.
The finished building was to
have
been 130 ft. high and the whole structure was to have been roofed
over. But the last 1/3 of the wall was never finished and
the roof was
never installed. Congress Hall sits today as a vacant, partially
finished
relic. The “main floor” is still a barren muddy field. One side of
the building is still open and without the brick core. The involvement
in WW II ended all construction
activity. The unfinished hall today serves as a reminder of the
failures of the
Nazi regime. |